Are we going commercial? Could be… Matter-of-factly last autumn we have started to work on this very pragmatic project for the transformation of a 2.000 sqm industrial building into offices to be let out next year on the Milanese market.

Overall Plan, click to enlarge

Overall Plan

To transform the existing building and to optimise the usable surface, all the existing structures of the courtyard will been demolished. The Main building (Block A) will be preserved and completely refurbished while a new smaller building (Block B) will be built from scratch. Block A sits on the corner of two urban streets and is characterised by a pitched roof and a regular clean facade. Block B stands on pilotis to enable car parking, has a flat green roof and will only be visible from the inner courtyard.

zum-pla-01-thumb

First floor plan (click to enlarge, then right click to zoom)

zum-pla-02-thumb

Second floor plan (click to enlarge, then right click to zoom)

To comply with the planning regulations, the overall volume of Block A will not been modified. A new mezzanine will be inserted above the top floor and suspended from a the new steel structure of the roof to exploit usable floor surface. To provide access and light to each office a new external corridor with a steel mesh and a suspended fire staircase will be added.

zum-sez-tra-thumb

Sections (click to enlarge, then right click to zoom)

The project will employ mostly prefab elements and reasonably cheap materials, Block B bearing structure as well as Block A corridors and staircase structures will be in steel. The new facades of both buildings will be clad with prefab sandwich insulating panels with metallic outer layer.

zum-out-02-thumb

View of the courtyard (click to enlarge)

zum-out-01-thumb

Block A - corridors (click to enlarge)

zum-bloc-a-01-thumb

Block A - office (click to enlarge)

The fact that we don’t know our final users (the offices will be let out after the refurbishment) determined the overall ‘mood’ of the interior office spaces. Colours have been basically avoided, bearing structures, partition walls and floor finishing have been deliberately distinguished and characterised with different (mostly black and white…) materials.

zum-bloc-a-02-thumb

Block A - office (click to enlarge)

zum-bloc-a-03-thumb

Block A - office (click to enlarge)

zum-bloc-b-01-thumb

Block B - office (click to enlarge)

zum-bloc-b-02-thumb

Block B - office (click to enlarge)

After some months of work the planning application has been submitted to the municipality and the few contractors invited to tender. The project should go on site after the summer, the refurbishment is supposed to be concluded before summer 2010.

zum-sdf-01-thumb

Block A - existing situation

zum-sdf-02-thumb

Block A - existing situation

zum-sdf-03-thumb

Block A - existing situation

zum-sdf-04-thumb

Block A - existing situation

zum-sdf-05-thumb

Block A - existing situation

zum-sdf-06-thumb

The courtyard - existing situation

Design Team:

Lorenzo Bini
Claudia Brunelli
Roberta Rizzi

Design Consultant:

Gennaro Postiglione

Structures:

Marco Clozza (Atelier LC)